Official solar cadastre · Luxembourg
HomeMunicipalitiesJunglinsterRue Edmond Goergen 11

Roof profile · Junglinster

Rue Edmond Goergen 11

6139 Junglinster

Very suitable
3 155 €
savings / year
~9 years
paid back in
28 899 €
net after grant
−10 000 €
Klimabonus grant

These figures reflect the full roof potential (23.7 kWp, Klimabonus grant deducted, paid back in ~9 years). You don't have to equip the entire roof: set the size that suits you in the simulator below — from the most affordable entry (~3 482 €) to the full potential.

Actual roof irradiation · solar cadastre (aerial view + heatmap)

Calculator · Klimabonus 2026

Size your system

We start at the ideal size for a household. Drag to aim higher — the government grant and your remaining cost recalculate live.

Rue Edmond Goergen 11: your roof can fit up to ~59 solar panels (~23.7 kWp). We start at the ideal size for a household — move the slider up to aim higher.

15panels6.0 kWp
Min · 5Roof capacity · 59

Get free quotes for this project

No obligation. No advertising, no data reselling.

Your turnkey project

Power
6.0 kWp · 15 panels
Estimated output
5 706 kWh/year
Turnkey price (3% VAT)
~11 780 €
Government grant (Klimabonus)5 742

The government covers ~49% of your system

Your remaining cost

~6 038 €

That's ~799 €/year in savings — paid back in ~8 years.

Over 25 years, you gain

~13 932 €

Cumulative savings minus your remaining cost · 2 282 kg CO₂ avoided/year.

Indicative estimate (official Klimabonus scale + LU market prices). Amounts to be confirmed by quote and via the Klima-Agence calculator.

Roof data

Characteristics from Luxembourg's official solar cadastre.

Photovoltaic suitability
Very suitable (PV class 2)
Solar thermal suitability
Very suitable (ST class 2)
Ground footprint
268 m²
Estimated usable area
120 m²
Installable power
23.7 kWp (~59 panels)
Estimated output
22 538 kWh/year
Estimated savings (self-consumption ~40 %)
3 155 €/year
Indicative gross investment
38 899 €
Estimated Klimabonus grant
−10 000 €
Net investment after grant
28 899 €
Estimated payback (on net)
~9 years
CO₂ avoided
9 015 kg/year
Postal code
6139
Municipality
Junglinster
Coordinates (WGS84)
49.706594, 6.243865
Cadastre identifier (HID)
131046
Estimate my installation

Estimate · official solar cadastre (Klima-Agence)

Call us